<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Smatters &#187; Hastings Bridge</title>
	<atom:link href="http://www.smat.us/archives/tag/hastings-bridge/feed" rel="self" type="application/rss+xml" />
	<link>http://www.smat.us</link>
	<description>Matters of the Smith-Atwood Family</description>
	<lastBuildDate>Thu, 19 Jan 2012 17:46:29 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>New Arch-style Bridge for Hastings</title>
		<link>http://www.smat.us/archives/557</link>
		<comments>http://www.smat.us/archives/557#comments</comments>
		<pubDate>Thu, 01 Jul 2010 15:39:59 +0000</pubDate>
		<dc:creator>Rick</dc:creator>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Hastings Bridge]]></category>

		<guid isPermaLink="false">http://www.smat.us/?p=557</guid>
		<description><![CDATA[MNDOT has finally announced the design for the replacement bridge over the Mississippi in Hastings. It&#8217;s an arch-style bridge, repeating the past two river bridge designs. The design cost came out about $100 MILLION lower than the MNDOT estimate. I suspect this is because the arch isn&#8217;t quite as huge as we might have expected. [...]]]></description>
			<content:encoded><![CDATA[<p>MNDOT has finally announced the design for the replacement bridge over the Mississippi in Hastings. It&#8217;s an arch-style bridge, repeating the past two river bridge designs.</p>
<p><img class="size-full wp-image-558 alignnone" title="New Hastings High Bridge" src="http://www.smat.us/wp-content/uploads/2010/07/finalrender.jpg" alt="New Hastings High Bridge" width="300" height="164" /></p>
<p>The design cost came out about $100 MILLION lower than the MNDOT estimate. I suspect this is because the arch isn&#8217;t quite as huge as we might have expected. I think the proposed appearance looks fine.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.smat.us/archives/557/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

